Proposed Design Improvement In Process Flow and Form Of Process Change Request at PT. ABC

Ken Warsy Triastuti

Abstract


PT. ABC is a corporation in the automotive manufacturing industry. In corporation's production, PT. ABC supplies goods from several suppliers. Quality management of suppliers and supply goods is needed by PT. ABC to obtain supplies according to the standards set by PT. ABC. The Process Change Request (PCR) is a requisite process for the standard change of supply items covering 4M (man, machine, method, and material). The process flow and form of Process Change Request have been standardized and listed on the Supplier Quality Assurance Manual (SQAM). The Supplier Quality Assurance Manual (SQAM) is the requirement document as a guide to the quality of parts and components, a corporation's internal quality assurance, and a policy for suppliers. In the process flow and form of PCR has been found a problem of inconsistency between the ideal time and the actual time of the PCR's approval phase which hampered the supply of PT. ABC caused by waste. In this study, the researcher proposed the improvement design to the process flow and form of PCR by applying the kaizen concept approach (continuous improvement) using the "plan" step of The PDCA cycle method (plan-do-action) and the fishbone diagram.

Save to Mendeley


Keywords


kaizen; PDCA; Process Change Request (PCR); quality assurance; waste

Full Text:

PDF

References


Adyatama, A., Handayani, N.U. 2018, “Perbaikan Kualitas Menggunakan Prinsip Kaizen Dan 5 Why Analysis: Studi Kasus Pada Painting Shop Karawang Plant 1, Pt Toyota Motor Manufacturing Indonesia”, J@ti Undip Jurnal Teknik Industri, 13, 169.

Kartika, H. 2020, “Penerapan Lean Kaizen untuk Meningkatkan Produktivitas Line Painting pada Bagian Produksi Automotive dengan Metode PDCA”, Jurnal Sistem Teknik Industri, 22, 22–32.

Fatma, N.F., Ponda, H., Handayani, P. 2020, “Penerapan Metode PDCA Dalam Peningkatan Kualitas Pada Product Swift Run di PT . Panarub Industry”, Jurnal Industri Manufaktur, 5, 34–45.

Khaerudin, D., Rahmatullah, A. 2020, “Implementasi Metode Pdca Dalam Menurunkan Defect Sepatu Type Campus Di Pt. Prima Intereksa Indastri (Pin)”, Jurnal Sains dan Teknologi Jurnal Keilmuan dan Aplikasi Teknologi Industri, 20, 34.

Wikipedia, “Taiichi Ohno”, https://en.wikipedia.org/wiki/Taiichi_Ohno, accessed 8 March 2021.

Duncan, “Taiichi Ohno - an intro to the father of Lean Manufacturingo Title”, https://www.getvetter.com/posts/159-taiichi-ohno-an-intro-to-the-father-of-lean-manufacturing, accessed 8 March 2021.

Ohno, T., 1988, “Toyota Production System Beyond Large Scale Production”, Productivity Press, New York.

Wilson, L., 2010, “How To Implement Lean Manufacturing”, The Mc Graw-Hill Companies.

PT. Toyota Motor Manufacturing Indonesia, 2006, “Toyota Supplier Quality Assurance Manual”, PT. Toyota Motor Manufacturing Indonesia, Karawang.

Badan Standardisasi Nasional, 2015, “SNI ISO 9001:2015 Sistem Manajemen Mutu – Persyaratan”, Badan Standardisasi Nasional (BSN).

Fitriani. 2018, “Siklus PDCA dan Filosofi Kaizen”, Jurnal Manajemen Pendidikan Islam, 7, 625–640.

Prasetiyo, B., Tauhid, R.S. 2019, “Penerapan Budaya Kerja Kaizen Di Pt X Kabupaten Bandung Barat”, At-Tadbir Jurnal Ilmu Manajemen, 3, 132–146.

Isniah, S., Hardi Purba, H., Debora, F. 2020, “Plan do check action (PDCA) method: literature review and research issues”, Jurnal Sistem dan Manajemen Industri, 4, 72–81.

Luca, L., Pasare, M., Ph, L., Stancioiu, A., Brancu, C. 2017, “Study To Determine a New Model of the Ishikawa Diagram for Quality Improvement”, Rliability Durab, 1, 249–254.

Hamidy, F. 2016, “Pendekatan Analisis Fishbone Untuk Mengukur Kinerja Proses Bisnis Informasi E-Koperasi”, Jurnal Teknoinfo, 10, 11.

Lab, T., 47 Great Fishbone Diagram Template & Examples [Word, Excel], https://templatelab.com/fishbone-diagram-templates/, accessed 9 March 2021.




DOI: https://doi.org/10.33508/wt.v20i1.3070